Flat Rates in Rate Tables
Hi All, How to implement the following scenarios in Rate Table / Calculation Sheets. Case1: Upto 15kg - USD 100 (Fixed)15-30kg - USD 10 per KG31-50kg - USD 12 per KG51+ kg - USD 13 per KG....
View ArticleError during Key Figure Upload from APO system through Template (HCI)
Hello All, While running key-figure load task from APO system into S&OP, using template SOP_KF_CapacityLimit, I am facing the error "Source 9ACAPACITY not found or not released (program...
View ArticleGR message in SAP
Dear all, I would greatly appreciate a reply in regards to using the GR message feature on the SAP (purchase order).How does the GR message get send out? Via email and if so where would you be able to...
View ArticleNWBC Error at Freight Unit
Dear TM Experts, We are not able to open certain freight units from NWBC. Tried with both OBTR-> Document flow navigation option and also from Freight Unit Display option in NWBC. We are getting...
View ArticleSXMB_MONI Missing Messages
Dear Experts, We are using messages POP_TransportationRequestSuiteRequest_Out & IntracompanyTransportationRequestRequest_In for sending and receiving data from ECC and TM respectively using PI...
View ArticleFinite tank planning in APO with PPM possible?
Hi gurus, I am preparing a PP/DS demo system (optimizer) for a beverage company. The idea is to model as much constraints as possible from their production system, and most of them seem to be related...
View ArticleTransfering CVC from Planning Area to Product.Alloc.group is failing
Dear Experts, I am new to APO Technical. I have a requirement to perfom the following steps: 1) Creation of Characteristic value combinations 2) Adjusting time series of created CVC's 3) Upload...
View ArticleUsing Access Capacity
Does anyone know how to force production in APO even though your safety days are fully covered. I have a situation where the actual required production at a plant is 130,000cs per week. However, due...
View ArticleHow can I delete CVCs in batch processing?
Hello Everyone, I'm working in SAP APO 7.02 Version. I need to include into a process chain a step to delete CVCs, ¿does anyone know how can I do this? Does the system have a standard transaction to do...
View ArticleSNC Transport Lanes and Web User Administration
I have created the TL for our vendor BP, and assigned it to the model/planning version. I do not yet have any entries in the "Product Specific Transportation Lane", but I do have the "Means of...
View ArticleSAP SNC7.02 PO XML message failing
Hello SNC Experts, We are implementing SAP SNC7.02 & SAP ECC6.04 and I am working on PO collaboration scenario. Replenishment_In (PO) XML in SNC system is failing to post for one particular...
View Articleintegrate ECC and EM both systems for Sales Order Tracking
Hi all, Can u please let me know the entire configuration steps for integrating ecc & em systems for sales order tracking? SFW5 business function Business process and event handler types?
View ArticleWork Area Deletion in PPDS
Hi All, We have a requirement to delete Work Areas in PPDS. While trying to delete in /SAPAPO/CDPSC3, pop up appears asking if deletion has to be done without dependant records or for all entries....
View ArticlePPDS
Hi All Could you please help in the below regard 1. Can we create a planned order in APO with out confirmation because check Inst contains Product and allocation check---> make to order case. 2....
View ArticleAdditional FCST/Demand in SNP planning book
Hi, My business want to do rough cut capacity planning in simulation version of SNP. We are using SNP.User wanted to enter some forecast/Demand and check if its feasible (running Heuristic only) and...
View ArticleSetting up a SAP JAM connection to S&OP
We are implementing a Test&Demo S&OP under AMAZON cloud. Things went quite OK however we are struggling with SAP JAM connectivity as well as creation of master data type where we cannot select...
View ArticleSales Order Scheduling using SAP TM 9.1
Hello, I have a question regarding sales order scheduling using SAP TM 9.1. We have a business scenario where customer places an order with multiple items and we combine the items for a full truck load...
View ArticlePPDS PP heuristic is not respecting fixed receipt elements
Hi Gurus,We are trying to standard lot heuristic and we see that when generating new orders system is not counting fixed planned order and process orders after planning time fence to generate the...
View ArticleMRP Area aggregation in SNP
Hi, Below is the detailed requirement. 1. I have one ROH material plant A and extended to 2 storage locations (B,C). 2. I have activated the MRP Area in ECC and maintained the MRP parameters as per my...
View Article/SAPTRX/EH_TASK - How are the entries created
Hi All, We are seeing entries in this table for all the rules in our rule set, even though the activity control "Log task" is not checked.Also, now that I want to switch it off for all the rules, some...
View Article