Quantcast
Channel: SCN : Unanswered Discussions - Supply Chain Management (SAP SCM)
Viewing all articles
Browse latest Browse all 5579

MRP Area aggregation in SNP

$
0
0

Hi,

 

Below is the detailed requirement.

 

1. I have one ROH material plant A and extended to 2 storage locations (B,C).

2. I have activated the MRP Area in ECC and maintained the MRP parameters as per my requirement (each storage location lot-sizes and Min/Max size).

3. I have transferred the plant/material to APO. In APO each storage location represented as a Location, now I have 3 locations in APO.

4. I am planning at  finished goods level and purchase requisitions generated each storage location as per my settings in BOM.

5. If go to SNP planning book, each location(B,C) requirements are showing and location A nothing.

 

BUT I WANT TO SEE THE REQUIREMENTS AT PLANT A LEVEL ALSO.

 

 

 

 

 

Regards,

LV


Viewing all articles
Browse latest Browse all 5579

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>