Hello SNC Experts,
We are implementing SAP SNC7.02 & SAP ECC6.04 and I am working on PO collaboration scenario. Replenishment_In (PO) XML in SNC system is failing to post for one particular situtation as described below.
When ECC PO have vendor material no in it and it transferred to SAP SNC (xml message have vendor batch no), xml message failed to post in SNC system. Attached are xml message and payload details.
If I remove vendor batch no from same PO and re-transmit PO to SNC, XML message posted sucessfully,
What is the reason xml message failing when it have vendor batch no in it and how to resolve this issue?