Program for Version copy from active model to inactive model
Hi all, I am trying to find out if there is any program through which we can copy a planning version from active model into a planning version in inactive model for backup purpose. I see that in TCode:...
View ArticleCreating Templates with a chart in S&OP Excel add-in
Hi Community I’m experiencing an error when trying to create a customer specific template in S&OP Excel add-in which is also supposed to include a chart. After creating a planning view layout,...
View ArticleGATP: GR time from SAP ECC PO
Hi, While implementing GATP we encountered the issue described in OSS note 1822406: The receipt date/time of a MRP element that includes GR processing time is determined in GATP by adding the GR...
View ArticleAPO 7.03. Production Campaign - Integration with ERP
Hi, I am using SAP ERP 6.0 and APO 7.03. I created campaign in APO and try to find out if I can see in SAP ERP that some planned orders belong to a campaign.Meaning: Can I see in SAP ERP that a planned...
View ArticleAPO-ERP Integration - Publication
Hi, I am trying to create the CIF Integration for the first time and see in APO that I have to make some settings for data transfer.my question is about the publication: 1. do I have to maintain the...
View ArticleHow come Incoming Orders Qty is not getting updated when allocation...
We have a requirement to check allocations at two different levels (customer/material) and (customer/category). We will only check the second level if the first does not have any allocation available....
View ArticleUsing Conditions for controlling ppf actions
Hi Gurus, I am trying to control the ppf action using conditions. Here's the requirement: Shipper is dealing with carriers directly. Request for containers is sent by shipper to carrier through...
View ArticlePlanning Area activation error E - Exception raised from TypeError: str2 is null
Hello friends During activation of planning area at the last step I get errorE - Exception raised from TypeError: str2 is nullAll other steps is successful. I will appreciate if anyone came...
View ArticleService Parts Planning - Configuration document
Hi Experts, I am doing configuration of SPP first time in demo system. It will be great help if I any of you can give me step wise configuration document of SPP. Thanks in advance.
View ArticleProduction order in APO at header material vanishes once the order is...
Hi, While the production order in ECC is released in ECC, it is not seen in APO at header material, earlier it is seen once created in ECC.the issues is, the confirmations of such orders are not...
View ArticleGaps in forecast calculation
Hello Community, I have an issue concerning forecast calculation which I am not able to explain..... For some particular articles in my planning book, the forecast (First-Order Exponential Smoothing,...
View ArticleAPO PPDS Production Campaign
Hi, I use APO 7.03. I created production campaigns with a few planned orders. But face a few issues: 1. in Deltareport see following error: Production campaign 000000000014 exists in APO without an...
View ArticleUpdate Service Level in BP (Carriers)
Experts, We have more 1000+ carriers which we are CIFing from ECC system to TM 9.1. We need to update the service level for all carriers in TM system. Any suggestion, what should be the best approach...
View ArticleDeployment not respecting the delivery date
Hi Experts,I'm facing an issue in deployment, its not respecting the delivery date.Example: We are using the bucket as week having 5 days, and t-lane duration maintained 1 wk. And requirements created...
View ArticleRFQ Response: file RFQ_RESPONSE.xlsx missing
While trying to upload the bid excel file in response to RFQ published on Portal, I'm getting following message: "Cannot submit response to freight agreement RFQ XXXXXX; file RFQ_RESPONSE.xlsx missing....
View ArticleStatus of Rate Table Validity
All,We are working on an interface to automatically update rate tables in TM. For each validity period, there is a status 'Released' or 'In Process'. While adding a new validity via the interface, is...
View ArticleHow does the demand propogate from DC to Plant
Hello Guru's, I have a very basic question . I have a DC and a demand on the DC , the DC is connected to the plant using Tlane . Now when i run SNP irrespective on...
View ArticleSAP GATP: Under which condition type i should add route,pick time,pack time...
Hi Experts, I have a issue where i need to maintain the ship to party and sold to party . I maintained both under codition type ULCA.Where i have mentioned the delivey open days.Now again i have to add...
View ArticleStandalone DP: Distribution Function based on customer order patterns
Hello, We are doing a pre-deployment of Demand Planning with integrations into and out of our legacy ERP systems. Our products are very short shelf life, high value, low margin and very short order...
View ArticleHow to skip the fact table /BI0/9AEDFC01 error while import phase in...
Hi. I am facing the below issue of the fact table while import phase in OS/DB migration and enclosed the below log for reference. /usr/sap/AQ2/SYS/exe/uc/linuxx86_64/R3load: START OF LOG:...
View Article