Hello,
I have a Material which had 2 PDSes sometime back. PDS1 has Resource1 and PDS2 has Resource 2. Some time back PDS2 was deleted(version also deleted from ECC). So, now the Material has only one source of Supply PDS1(with Resource 1). There are no open orders of the past which were on PDS2 or say, resource 2. So basically Resource 2 should now have no connection with Material.
However, when I load Resource 2 in Capacity View and drill down at Product Level, I can still see the said Material in the list with other materials(for which Resource 2 is still valid). Not sure why the Material would now appear there. Also, when i try to create any order for this material in Capacity view for resource 2, it says- No valid PDS/PPM available-which is fine, but why would the material appear there in the first place?
This is happening for many other materials as well.
Any suggestions?
Thanks,
Kunal