Can you please help for the below scenario
A train pickups the load at "A" and goes by "B".Pick up the load at "B" and goes to "C" where it drops some load of A & B and again pick ups the load at "C" and drops remaining load of A ,B and C and D.
A-Bag1,Bag2
B-Bag3,Bag4
C-Bag5
A----------> B------------>C----------->D
At C Bag1 and Bag3 are dropped
At D Bag 2 and Bag 4 are dropped
The weight of bag1,bag2 are 2 & 3 Kgs resp
The weight of bag 3 & Bag4 are 3 & 4 Kgs resp
The weight of bag5 is 4 Kgs
Distance between A & B is 200 KM
Distance between B & C is 150 KM
Distance between C & D is 300 KM
Bag 1 has travelled a distance of 350 Km
Bag 2 has travelled a distance of 650 KM
Bag 3 has travelled a distance of 150 KM
Bag 4 has travelled a distance of 450 Km
Bag 5 has travelled a distance of 300 KM
Iam using the stages in a freight order for various stops.
I want to calculate the charges based on the distance travelled and weight of each bag.
Iam inserting the bags as Products in Freight order.
Can anyone help me out,what are the settings that i have to perform in order to capture this scenario
I have tried by using the standard Calculation base such as " Actual distance " and "Straight line distance" but still i cannot able to capture the actual cost correctly.
More over i have found the source and destination locations of all the bags as "Source and destination location of the freight order" in the Item table,which is not correct.
Once i have inserted the products at "A" iam changing the status as "Departed for the stage and iam inserting the products at "B".But when i have checked the "ITEM" table,i have found the source and destination of the bags inserted at "B " as "A and D".which is wrong.
I need you help in order to resolve this.
Please take it as very high priority.
Thanking you in advance