Quantcast
Channel: SCN : Unanswered Discussions - Supply Chain Management (SAP SCM)
Viewing all articles
Browse latest Browse all 5579

Substitute the default plant with the other plant during availability check

$
0
0

Hi All,

 

I would like to discuss a scenario of GATP for location substitution.

 

Customer – 11, Material – GATP1, Plants – DC1 and DC2,

Stock at plant DC1 for GATP1 = 100

Stock at Plant DC2 for GATP1 = 125.

Plant DC1 is the default plant in the customer master. There is no customer – mat. Info record.

 

Now in the normal case when the customer is ordering material GATP1, it is supplied from the plant DC1. If the stock is not available in the plant DC1 then location substitution takes place. The balance quantity is supplied from the plant DC2. If there is unconfirmed quantity at DC2 then it comes back as unconfirmed quantity in the plant DC1.

 

But in a specific case, for a particular order type the supply should be done from the plant DC2 only. The constraints are –

1.There is no change in the default plant setting in the customer master

2.There is stock of GATP1 in the plant DC1

3. I want to avaoid ABAP coding

 

Do you have come across such scenario where location substitution takes place in spite of unrestricted stock is available in the default supplying plant?

Let me know your views to address the requirement.

 

 

Thanks& Regards

 

Piyush Ranpura


Viewing all articles
Browse latest Browse all 5579

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>