Hi,
How do we load data for future periods using HCI?
E.G.
We get data for KF1 @ Prod Loc Level for Current Month
P1 L1 100 2015-08-01 00:00:00
How do we populate this data for next 12 months.
I need 11 more records.
I don't want to create 11 new dataflows where I keep changing the month.
I was going through some of the predefined templates of Inventory / Demand data where I do see we get variable value for future period in preload script.
But how do we use it in postload script.
Thanks,
Purav