Hello Gurus,
i have checked the online resources first before posting this thread here as this is most old topic relating to upload of excel data to planning book key figures.
Here is what i have done so far
1) from the planning book, i chose a view and downloaded the file to desktop and saved it as CSV. i populated the key figure values and saved the csv file as-is back to desktop
2) i had to remove the hdeader from the file as APO threw back an error that it could not interpret the period (header) as the number
3) when i took out the header i simply pasted the values and the file was ok
4) i went to planning book, loaded the file, checked the file and it said that the data was read and i clicked on upload the file
5) everything was green, then but i do not see the values in the grid of the planning book
what else i'm missing.
can someone please help me
thanks
Ravi