Hi,
If we have 1 product with 1 PPM and 2 modes as a result of alternative sequence in a routing (e.g. 2 possible lines), then product planning
table shows both of them with the same description , see attachment.
how can I change / what I need to do, to see the description of the work center for example to be able to distinguish between both lines in the product planning table?
thank you in advance!
br,
Pilvi