Hi Experts,
We have a requirement to change the planned order date during heuristic run so that this can be planned based on calendar maintained.
I was trying to trigger BADI /SAPAPO/SNP_GET_DATE during location heuristics.
Unfortunately I could trigger that only when we do not have any PPM. But if there is a PPM existing for the same location product the BADI does not trigger.
We want to change the receipt date by using this BADI.
Kindly let me know your views.
Thanks,
RP.