Hi APO Experts,
In our project, we have received more sales order inconsistencies which is not clearing by CCR program and it is clearing by program /SAPAPO/SDRQCR21 with option as Build Reqmts from Doc. Flow, So We have decided to schedule the background job on daily basis for program /SAPAPO/SDRQCR21 with option as Build Reqmts from Doc. Flow, performing the testing in our quality system and observed the below strange behavior.
When I am running the program /SAPAPO/SDRQCR21 with Range of products and some location range with option as Build Reqmts from Doc. Flow, in Background job. In output it is suggesting to delete one sales order. If I checked that Sales order in ECC, it is for an different location, that is not part of my selection and the order is open. In MD04 the Qty is showing 1 ( as per sales order) but in APO RRP3 view the order qty is showing Zero. I have run the CCR, it is coming in different in content and if I push, the different is not going to APO.
I have tried running the program /SAPAPO/SDRQCR21 with plant which is mentioned in that sales order with option as Build Reqmts from Doc. Flow, in Background job , it is suggesting this sales order under update option correctly.
Can you please help me understand why it is behaving differently like the location is not part of my selection and why it is suggesting the wrong action. And also whether is it advisable to run the /SAPAPO/SDRQCR21 with option as Build Reqmts from Doc. Flow at plant range and material range in background job.
Thanks & Regards,
Sundaram Radhakrishnan