Macro not working at level change

$
0
0

We have defined a macro “Original PL Wise Plan”

The macro is intended to do the calculation of
PPL wise production plan = PPL wise production plan * Share of PL within PPL.
E.g. in this case PPL wise production plan for
Indica is 200. (The same is displayed in Grid 2)
The PL share of ‘Indica v2’ within PPL Indica is 15% for  & 85 % for PL ‘Indica
Vista’ .
Hence PL wise production plan should be calculated as 15*200/100 = 30 & for Indica V2  it should be 85*200/100 = 170 for Indica
Vista.
I have defined the macro with aggregation level for grid 1 as level 2 and level 1 for grid 2 & saved the macro for level
change.
But it does not calculate the PL wise production plan in the planning book.

PB.PNG

 

Macro details.PNG

Macro level.PNG

 