Quantcast
Browsing all 5579 articles
Browse latest View live

Can we use SNP without DP?

HiClient needs only SNP ,As sales projection(Forecast) is constant,planning to release forecast directly to infocube then to SNP Planning area without DP.kindly give me suggestion for th following...

View Article


Image may be NSFW.
Clik here to view.

confirmation activity:start time greater than remaining start time

Hello Experts While CIFing Production orders I am getting the above error "confirmation activity:start time greater than remaining start time". or sometimes the error says "invalid confirmed start time...

View Article


PPT - Production view - Periodic

Hi, Is it possible to show PDS procurement priority on Production view - Periodic screen?I have 5 PDS for a product and would like to see the procurement priority from PDS on this screen.  Thank you,Anir

View Article

Excel add-in with Office 2013

Hi Colleagues,does anyone know if Office 2013 is supported with S&OP 3.0?  If not, when it might become available?thanks-Kamala

View Article

SDP94

hiEven as I work on SDP94 I could see both planning book(the shuffler at the top )  and data view (selection profile) delivering similar datas  ,what is the significant difference  behind both these...

View Article


months to weeks

hiThe DP part is loaded with quantities on a monthly basis (uncontrained demand ) now I am going to release to SNP via MC90  ,this event “release “ should spread the quandities into SNP on a weekly...

View Article

Error Inconsistent relationship during PDS transfer

Hi All,We are getting error inconsistent relationship during transfer of PDS. Relationship are correct but still we are getting error because we have enhancement to remove setup activity  and...

View Article

Single TO with repeated Material diffrent quantity

Hi All, as per my business requirment i have to create single TO for repeated material with diffrent quantity, and i cant change quantity in delivery.for example: item 10     Material 2000001     qty...

View Article


Need a Macro logic

Hi Experts,   My client wants to see accumulation of sales History in a INITIAL column in the planning book. So could you pls provide any logic and pre requisites for this.  Regards, Ram

View Article


Dump analysis

Hi,I am new in TM technical and when I analyzed a dump I got the lv_node_key value  by typing in the node_key variable by searching in the dump.Can you tell me from the node key how do I exactly know...

View Article

APO Planned Orders to R/3

Hi Team, We are running MRP in our APO system. APO generates planning proposals (Eg: planned orders) for next 6 months. But R/3 team would like to receive the planned orders for only next 3 months. Is...

View Article

Issue with AT101 field

Hi All, My requirement is pass the field AT101 from ECC to APO side. For this I have used the Use exit EXIT_SAPLCMAT_001. But i'm unable to see the changes in AT101 field I in the APO side for...

View Article

Leg determination

Hi      I am working on Leg determination where i came across in shipment type doc Determine Legs:Blank                        0:only determine assignment of deliveries                        1:legs...

View Article


Partially delivered orders which was not issued consuming allocations from QTTAB

Hello Dear Experts, I came across a strange issue in APO GATP where i see the partially delivered items which was not goods issued yet(Open deliveries) consuming allocations from QTTAB in APO upon back...

View Article

Setting up FSD / Cost distribution integration process between TM & ECC

Hi Experts,  we are trying to setup the FSD / Cost distribution integration process between TM & ECC but the XML fails in ECC with the following error “No condition type could be determined...

View Article


Transferring Data from SNP to DP

Hello All, Have a requirement wherein I want to transfer SNP departure plan data into DP. The departure plan (STR) has both the source and target location However I need to release it on Product,...

View Article

Error During the Retrieval of the Logon Data Store

Hello Experts, In our SAP SCM 7.0 we are receiving error - "Error during the retrieval of the logon data store" in transaction /n/sapapo/cq when i click on the option "Go to SMQ1/SMQ2 by selecting the...

View Article


Image may be NSFW.
Clik here to view.

RFC connection between ECC6 and SCM7

Hi APO Gurus  I am new to SAP APO field can Anybody help me..? how to set up RFC connection between ECC6 and SCM7 in detail.  Thanks in AdvanceSharanu

View Article

Relation Between PA and MPOS

Hi Team, i have one basic question, for sap apo demand planning  all the master data is saved in mpos only characteristics  (back end cube) and all the keyfigure's are saved in planning area (times...

View Article

Image may be NSFW.
Clik here to view.

Dependent requirement is NOT updated after production order confirmation

Dear ExpertWe are integrating a Non-ECC system with SAP APO-PP/DS, but after production order confirmation, the dependent requirement of component is not updated accordingly.Planned order 1000002 of...

View Article
Browsing all 5579 articles
Browse latest View live


<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>