Can we use SNP without DP?
HiClient needs only SNP ,As sales projection(Forecast) is constant,planning to release forecast directly to infocube then to SNP Planning area without DP.kindly give me suggestion for th following...
View Articleconfirmation activity:start time greater than remaining start time
Hello Experts While CIFing Production orders I am getting the above error "confirmation activity:start time greater than remaining start time". or sometimes the error says "invalid confirmed start time...
View ArticlePPT - Production view - Periodic
Hi, Is it possible to show PDS procurement priority on Production view - Periodic screen?I have 5 PDS for a product and would like to see the procurement priority from PDS on this screen. Thank you,Anir
View ArticleExcel add-in with Office 2013
Hi Colleagues,does anyone know if Office 2013 is supported with S&OP 3.0? If not, when it might become available?thanks-Kamala
View ArticleSDP94
hiEven as I work on SDP94 I could see both planning book(the shuffler at the top ) and data view (selection profile) delivering similar datas ,what is the significant difference behind both these...
View Articlemonths to weeks
hiThe DP part is loaded with quantities on a monthly basis (uncontrained demand ) now I am going to release to SNP via MC90 ,this event “release “ should spread the quandities into SNP on a weekly...
View ArticleError Inconsistent relationship during PDS transfer
Hi All,We are getting error inconsistent relationship during transfer of PDS. Relationship are correct but still we are getting error because we have enhancement to remove setup activity and...
View ArticleSingle TO with repeated Material diffrent quantity
Hi All, as per my business requirment i have to create single TO for repeated material with diffrent quantity, and i cant change quantity in delivery.for example: item 10 Material 2000001 qty...
View ArticleNeed a Macro logic
Hi Experts, My client wants to see accumulation of sales History in a INITIAL column in the planning book. So could you pls provide any logic and pre requisites for this. Regards, Ram
View ArticleDump analysis
Hi,I am new in TM technical and when I analyzed a dump I got the lv_node_key value by typing in the node_key variable by searching in the dump.Can you tell me from the node key how do I exactly know...
View ArticleAPO Planned Orders to R/3
Hi Team, We are running MRP in our APO system. APO generates planning proposals (Eg: planned orders) for next 6 months. But R/3 team would like to receive the planned orders for only next 3 months. Is...
View ArticleIssue with AT101 field
Hi All, My requirement is pass the field AT101 from ECC to APO side. For this I have used the Use exit EXIT_SAPLCMAT_001. But i'm unable to see the changes in AT101 field I in the APO side for...
View ArticleLeg determination
Hi I am working on Leg determination where i came across in shipment type doc Determine Legs:Blank 0:only determine assignment of deliveries 1:legs...
View ArticlePartially delivered orders which was not issued consuming allocations from QTTAB
Hello Dear Experts, I came across a strange issue in APO GATP where i see the partially delivered items which was not goods issued yet(Open deliveries) consuming allocations from QTTAB in APO upon back...
View ArticleSetting up FSD / Cost distribution integration process between TM & ECC
Hi Experts, we are trying to setup the FSD / Cost distribution integration process between TM & ECC but the XML fails in ECC with the following error “No condition type could be determined...
View ArticleTransferring Data from SNP to DP
Hello All, Have a requirement wherein I want to transfer SNP departure plan data into DP. The departure plan (STR) has both the source and target location However I need to release it on Product,...
View ArticleError During the Retrieval of the Logon Data Store
Hello Experts, In our SAP SCM 7.0 we are receiving error - "Error during the retrieval of the logon data store" in transaction /n/sapapo/cq when i click on the option "Go to SMQ1/SMQ2 by selecting the...
View ArticleRFC connection between ECC6 and SCM7
Hi APO Gurus I am new to SAP APO field can Anybody help me..? how to set up RFC connection between ECC6 and SCM7 in detail. Thanks in AdvanceSharanu
View ArticleRelation Between PA and MPOS
Hi Team, i have one basic question, for sap apo demand planning all the master data is saved in mpos only characteristics (back end cube) and all the keyfigure's are saved in planning area (times...
View ArticleDependent requirement is NOT updated after production order confirmation
Dear ExpertWe are integrating a Non-ECC system with SAP APO-PP/DS, but after production order confirmation, the dependent requirement of component is not updated accordingly.Planned order 1000002 of...
View Article