Hi
Sources 4001,4002 and destinations 3001,3002,3003 & 3004,After SNP optimizer run,the following results are displayed
4001 to 3001 -------900MT is sourced from 4001 to 3001
4001 to 3003--------1000MT is sources from 4001 to 3003
How cost per MT is displayed along with quantities in the planning book after optimizer run
Thanks