Hi Guys,
Multiple PPMs are available in the system , When the firm planned order created in /sapapo/rrp3 period tab for the PPM3 after sending the planned orders to ECC, the PPM got removed from the planned orders.
All PPM have validity period from 01/01/2013 to 30/12/2039 and lot size of 0 to 9999999.
There is no user exit to modify the source of supply, any idea what will cause this change.
You help very much appreciated.
BR
Thamizh