Scheduling dates from sales order not confirmed

$
0
0

Hi All,

 

I have configured CRM_APO_ECC integration in system. But getting few error on CR$M-APO side. Can you please sugest on these queries:

1. order entered in CRM, ATP check is triggered in GATP & confirm dates & vendor (plant) populated with 2 schedule lines. But when I save the order, I get RED signal on item details tab, also I could not see order in RRP3.

CRMD_ATP1.png

CRMD_ATP2.PNG

 

2. Second query is regarding RBA. I have configured location sub rule. But when the qty in initial plant is less, it does not give me the substitute location, rather it proposes me later date considering the checking horizon maintained in product master.

But when I manipulate the same material with error (i.e. by removal of ATP group in product-loc master), and create order for same material, I can see the rule in place when ATP is triggered and can see 2 line items on ATP screen, first showing RED light (for which ATP grp isnt maintained) and 2nd is one with substitute location. In this case, it works. Where is my config missing?

 

Please help me with these 2 situations.

 

Many thanks,

AP.