Hi SAP Gurus,
Do you know if there is a way to have MRP look at the Planned Delivery Time from the Material Master (MRP 2 tab) instead of the PIR?
We would like to create global PIRs with a PDT of 1 and have the Material Master PDT set to a different number (example 5). So when MRP runs it will read 5 instead of 1.
Any additional information is appreciated.
Thank you
-nic