Hi,
I am trying to do small testing over PP run in SAP APO.
I have created everything manually in SAP APO(Product,location,No source of supply at Plant)
When running SNP at plant getting planned order without source of supply.Now i am trying to convert the same order into PPDS order using program(indicator is set).
Getting the below error:
"In-house production 188401198 is not valid for the conversion"
Any suggestion if this conversion is posible?
Thanks,
Krishna