Hi Experts,
As of now, our SAP system (in it's present configuration) gives me the lead time (Operations: Testing+Assembly as seen in APO: RRP3) for a particular product based upon the quantity: For example for 100 parts assembly time at a subcon is 1 day and for a million part we get an extended time frame. Can you suggest me a solution where I can have a fixed time irrespective of the quantity of the required part. I am trying to have both options, quantity dependent as well as independent lead times. is there a way we can switch between the both with ease?
Appreciate your help!
Rohit