Two Skus :
ABC100 @ Chicago
DEF100 @ Atlanta
There is a selection profile for these and composite model runs as a backgroundjob.
But for
ABC100 @ Chicago there is an entry in msdp_fcst2 where the Forecast profile 2quarteraverage is assigned.
Is there a way the background job to run 2 qtr average and not composite model for
ABC100 @ Chicago
side note: the msdp_fcst2 table is obeyed when I run just model56in background but not composite
Any workarounds are also ok