Hello
Dear Colleagues, I'm using the PP/DS Optimizer to cschedule with good results, but I need to
remove small time gaps that the solution of the optimizer didn't resolved.
(I have no restrictions that could result in these gaps )
I have tried to remove this gaps with the standard reschedule heuristic SAP001 "Schedule Sequence Heuristic" but it takes in to account
just the parameters of the Heuristic changing the sequence that the Optimizer gave, I also have tried using the SAP003 Schedule Sequence Manually but it only gives me an schedule error.
Basically I want to maintain optimizer sequence but enhance it by removing not desired gaps by the simplest way.
Thank you for your help,
Gonzalo García