ECC planned Shipment end date doesn't reflect the Goods receipt date and time from TPVS

$
0
0

Dear all,

 

To summarize you the context, we are using TPVS to plan our Shipment end trigger the Delivery and Shipment creation from SAP APO to ECC.

I figured out that the Goods receipt date and time defined in TPVS (based on the calendar resource) doesn't match with the planned shipment end date of ECC (Transaction VT03N) and  this situation occurs reporting issues.

 

Example :

 

TPVS :

 

Loading time (1h) : 28.11.13 at 09h20     to 28.11.13 at 10h20

Transportation Time (12h): 28.11.13 at 10h20 to 28.11.13 at 22h20.

Goods Receipt : 29.11.13 at 08h00 => the customer location has a calendar resource assigned with opening hours from 08h00 to 16h00. This is the reason why the Goods receipt cannot be the 28.11.13 at 22h20.

 

 

On the ECC Shipment, the Planned shipment end date is equal to 28.11.13 at 22h20 meaning the end of the transport and not the Goods receipt time coming from TPVS.

 

If any of you had the same issue it would be great to have your advice on this point.

 

Thanks.

Jean-Philippe