Hi,
Is it possible to integrate cfolders (installed in SNC system) with the ECC.
We would like to upload documents via cfolders, lets say for a PO or Quality notification, and that document should be sent over to ECC so that User should be able to view the document in ECC PO screen, this should happen vice versa also. Is it possible in Std SAP configuration?