Hello, a question please.
We use Stock Transfer with the Rules-Based ATP, and I have configured Transportation and Shipment Scheduling using the condition technique.
During a GATP check, if stock is not available in the selling plant (Plant 2), the user can select a substitute plant (Plant 1), and after saving of the sales order, a Stock transfer requirement is automatically created to transfer stock from manufacturing plant to selling plant.
I use the scheduling conditions, PICK to determine pick time, a transportation lane to determine transfer time, and then UNLD to determine goods receipt time at Selling plant. This is where it seems to me that GATP stops.
I also have the customer created in APO, and a transportation lane created from the selling plant(Plant 2), to the Customer, but GATP does not consider this during the delivery date calculation.
How can I get GATP to go further, and after the material was unloaded in Plant 2, then consider pick time and transportation time from plant 2 to customer.
So if it makes sense, I want scheduling to happen first from substitute plant to sales order plant, and then from sales order plant to customer.