Our customer wishes to use an object dependency in a routing operation which changes a value in the planned/production order depending on criteria in sales order characteristics A dependency is created in ECC which changes the value of the labor time in an operation in the routing for material depending on characteristics. This dependency is assigned to the operation. The structure and field that changes in the ECC planned/production order is PLPOD_VGW04. This is the labor time in the operation. This changed value in ECC also needs to change the equivalent field and value in APO to reflect the value from ECC. To map PLPO to APO structures we maintained the APO table “/SAPAPO/CUCDPMAP” as follow: Char. Source GUT_DUR_STUFFING Structure in Source PLPO Source Fld Name VGW04 Struct. Name APO /SAPAPO/CULL_CFG_MODE_PRODUCE Fld Name APO DURVAR Nevertheless we still getting the APO error "Error Field VGW04(structure VGW04) does not belong to operation structure" when creating a sales order . Many thanks B. regards Ingo
↧