Hi All,
In an capacity check planning how to make Production(Planned) Key Figure Editable when Product/PPM is selected/drilldown using a macro.
I am aware of ROW_INPUT Function with arguments "0" and "1" for edit/non edit.
However edit mode has to b triggered based on drill down(Product/PPM).
Could anyone throw some light on the same to achieve the functionality.
Thanks
Ramesh.