Dear Gurus,
Please clarify the following question:
Can we perform ATP check only at a characteristic level, without checking the level of a Distribution Center?
We have following business case:
Category | Recipt/Rqmts Element | Recipt/Rqmts Quantity | ATP Quantity |
---|---|---|---|
Stock | Distribution Center | 100 | 70 |
Inquiry | Inquiry №1 | -30 | |
Stock | Characteristick A | 100 | 100 |
Stock | Characteristick B | 0 | -30 |
Inquiry №1 | Inquiry №1 | -30 |
ATP Quantity at Distribution Center level is less than ATP Quantity at the characteristic level A. Than user create Inquiry with characteristic «A» (ATP quantity for this area is 100 ) system confirm only 70 , because only so much we have available stock at DC level.
This is contrary to the business requirements. It is necessary that the system confirm the quantity that is available at the specified characteristic.
Is it standard system behavior or it is wrong configuration?
Thanks in advance!
Regards,
Vladimir Bagaev