Dear Experts
I have recived Business requirement which is be to model in sapapo
1) Actually my material comes under category of stock item
It is steel manufacturing organization . i am suppose to designed three level Bom for getting finished material
2) My lowerlevel material Sketch Steel in bom is semifinished material
3) My 2 lower level material single sketch steel in Bom it is also semi finished material
4) My final finished material Coiled steel
so I want to implement consumption based planning with PPDS Block planning by matching charcterstics (CDP)
Please suggest what master data i need to mantain in APO product master and iam planning to use Reorder point planning SAP_PP_007
First I am suppose to generate Planned independent requirement for finished material as per Bom it should generate PIR for my semifinished material
After running Reorder point heuristics it should reduce my Planned indpendent requirements and planned orders should be generated .
Thanks& regards
virender