Hello,
I am trying to do a charge calculation for a FO. I have maintained the FA and have attached the calculation sheet. At the FA, at the TCCS level I have ticked the check box for header-level charge and also done the required configuration at the calculation profile>>Calculation level to be at the header level. When I run the calculate charge in the FO the FA gets determined correctly but the calculation sheet is not getting determined and giving error mentioning "Agreement XXX eliminated as associated calculation sheet is invalid".
Could anybody throw some light on this issue?
Thanks in advance.
Regards
Vinay