Dear all,
We have a destination location connected from vendor. There is a PO created from vendor to destination location. When shipping notification is created for for this PO, at destination location, it appears as in-transit, but at the source location i.e. vendor there is still dist. demand (TLB-confirmed).
This, primarily, results due to the fact that there is no vendor location in ECC, hence there is no PGI from vendor.
Is there any way to resolve the same as this pseudo-demand element is resulting in unfulfilled demand at vendor location in the optimizer run?