We created a change number which valid date is in the future. And we created a BOM for a component with this change number. Then add this component to the BOM of finished product.
e.g. A(fert) : B(halb) 2015.01.01-9999.12.31
C(halb) 2016.06.01-9999.12.31
C(halb): D(roh) 2016.06.01-9999.12.31 (valid of header is also from 2016.06.01)
What I want to understand is: will APO honor this change? Can this change be reflected to integration model before 2016.06.01?
If not, what is the best method to reflect it in APO?