Hello TM Specialist,
On creation of forwarding order, we observe a "Blocked" status on stage level.
All the necessary data (transportation mode, movement type, source/destination location at stage, different pickup/delivery date -time at stage) are verified and appears correct. So the possibility of missing required data for planning is ruled out. Also, the stage is determined by stage profile and the config setting is set to "relevant for planning". This stage level status block in forwarding order, in turn puts a planning block on the stages at freight unit with no reason.
What can be the other possible reason of such "Blocked" stage status?
Please help.
Thanks and Regards,
Priya