Are there options in PPDS to restrict Production Planning run to use partial Resource capacity based on Products

$
0
0

Hi,

 

I am trying to model the following scenario in PPDS.

 

Plant P100

Product A - Order 500 units (Date 05/15)

Product B - Order 40 units (Date 05/15)

Resource Capacity - 100% - 200 units per day

 

 

When I execute a PPDS run, Product A should utilize only 90% of capacity of resource per day and 10% by Product B. How can i achieve this?

 

Master Data:

 

Resource - NO PPDS bucket capacity, Finite capacity is Time-Continuous with 100% utilization rate.

PP/DS PDS, no setup time.

In-House Production, No Procurement

Finished goods and components, PDS exist at Plant P100.

 

I have modeled something similar using the PPDS Optimizer to restrict capacity utilization by a set % of utilization rate maintained in the resource, but executing optimization or scheduling takes place at resource level and I do not see any kind of filter to restrict by products. The optimizer resulted in using 90% of capacity for both Product A and Product B combined.

 

Appreciate your inputs.

 