Hi experts,
When i start configuring i could see there is a prevailing confusion in me for a long long time ,,a messed up perception regarding time related parameters in both ECC and SCM ,and few other things too ,would you please help out in clearing the confusion once and for all, please correct me if I am wrong in the last column
Time entity | Guess work | Apart from this fields Where are are the other places .do I fix? |
Planning horizon (ECC) |
|
|
SNP horizon | In SNP2 tab of MAT1 |
|
PPDS horizon | In PPDS tab of MATI and also in t code where you fix the model/version 000 |
|
Planning period (bucket) for SNP --,I want to fix as 1 week. | No idea | Where to fix it? |
Planning period(bucket) for PPDS 6 shifts ie 2 days .Where do I fix this 2. | Guess it is in Create model /version screen I guess | Where to fix it ? |
Time bucket profile | Is there anything like SNP time bucket profile and PPDS time bucket profile ,is it that I need to make a definition in TR32 individually for SNP and PPDS separately just like SNP PPM and PPDS PPM , |
|
Storage bucket profile | This suggests the longevity of planning results to stay in the system -after the stated time has elapsed planning datas become defunct,it has no relevance with planning period of SNP or PPDS |
|
How to update the resources in APO, | No idea |
|
SNP horizon ends with beginning of PPDS horizon or the fag end of PPDS horizon | Guess PPDS horizon is a horizon within a horizon |
|
Difference between SNP PPM and PPDS PPM | No idea |
|
Difference between single activity and multi activity resources in RES01 | single activity means Single operation in a resource pool.like drilling alone or maching alone
multi mixed means Multiple operation in a resource pool like both drilling and maching |
|
please clear my messed up perception..
thanks
OHIO