Hello Fellow Experts,
I'm using RBA location substitution to create a STR and confirm order
Three locations: L1, M1 and N1
Product: PA1
Stock at L1 is 0, Stock at M1: 100 and N1: 100
Location substitution list in location determination procedure is setup like:
L1-->M1
L1-->N1
In this case system creates a STR from M1 to L1 because that's how its setup in the location substitution list based on a Fan Shaped Procedure Type 2
However the fastest way to meet the customer CRD is through N1 due to the routes, pick, pack or holidays involved. Is there a way to optimize the logic to meet the CRD date
Thank you!