Current Behavior: The Time stream source while ATP of the sales order is the location, which is, either plant (location 1001) or MRP Area (Location 1007).
Question: How can I have the time stream source as shipping point (Location 1003)
Requirement: The requirement is to have different shipping calendars depending upon the OLTP shipping point of the sales order.
This is to have, the In-house activities, such as picking/packing and loading, to be calculated based on this shipping calendar rather than the shipping calendar assigned in the location master
-!!Note: The shipping point has been included in the CIF model and have been activated.