Creating planned orders in MRP area

$
0
0

Hi

 

We have a business requirement due to which I am creating a new MRP area in APO and want to create planned orders there using SNP

I CIFed the MRP area, products are extended, PDS is extended, tlane is created.

 

But when I run heuristics, its not working correctly. First of all, system creates a firmed planned order in the main location (for ex 8000) without any source of supply in addition to the Distribution receipt to the 8000_MRP. The Firmed planned order however is not considered in total receipts, so not sure why it is being created there.

 

At 8000_MRP, i see the Distirbution demand planned, but when i run planning, it is not creating any orders or giving short dump.

 

I tried same set up with PPM, I am able to create the planned orders at 8000_MRP with the source of supply assigned.

The firmed planned order at 8000 still occurs.

 

We want to do the setup with PDS.

 

Any inputs?

 

Thanks

Hari