Hi
We have a business requirement due to which I am creating a new MRP area in APO and want to create planned orders there using SNP
I CIFed the MRP area, products are extended, PDS is extended, tlane is created.
But when I run heuristics, its not working correctly. First of all, system creates a firmed planned order in the main location (for ex 8000) without any source of supply in addition to the Distribution receipt to the 8000_MRP. The Firmed planned order however is not considered in total receipts, so not sure why it is being created there.
At 8000_MRP, i see the Distirbution demand planned, but when i run planning, it is not creating any orders or giving short dump.
I tried same set up with PPM, I am able to create the planned orders at 8000_MRP with the source of supply assigned.
The firmed planned order at 8000 still occurs.
We want to do the setup with PDS.
Any inputs?
Thanks
Hari