Dear all
Is it possible in SNP to plan on batch shelf life data?
Example:
Requirement date 20.09.2013
Batch A: shelf life expiration date of 18.09.2013
Batch B: shelf life expiration date of 30.09.2013
Run SNP heuristics on demand of requirement date 20.09.2013. Batch B should only be taken into account for stock netting. Is this possible in SNP?
If not, can this only be possbile using PP/DS?