Dear all
I have a question regarding PDS explosion in SNP.
Example
Level 0 of a multiple SNP PDS
Product A finished product has PDS 1 and PDS 2
Level 1 Component B has PDS 1 and PDS 2
Level 2 Raw material C has PDS 1 and PDS 2
All the SNP PDS have the same validity dates, lot size selection etc.
Question: is it possible in SNP to do an multiple explostion on selection of SNP PDS 1? And the second SNP run only an explostion on SNP PDS 2 for the finished product, component and raw material?
Or should it be possible in PP/DS?