Withdrawal qty wrong in APO forecast consumption (in case of partial delivery)

Hi to everybody

 

our customer has

- R/3 4.7

- APO 4.1

 

We are migrating R/3 4.7 to ECC 6 and during test we face a problem in APO forecast consumption never occured before related to withdrawal qtys.

 

 

 

Scenario:

 

Step 1: we release from APO DP a forecast = 100 pcs

 

Step 2: we enter a sales order in ECC = 50 pcs

Forecast consumption works well: unconsumed forecast = 100 (planned qty) - 50 (qty allocated to the sales order) = 50

 

Step 3: we create a delivery for the sales order for a partial qty = 10

Forecast consumption works well: unconsumed forecast = 100 (planned qty) - 40 (qty allocated to the open sales order qty) - 10 (qty allocated to the delivery) = 50

 

Step 4: we do the Good Issue of the delivery

Here we have problems

 

Our expectation is

- withdrawal qty = 10

- unconsumed forecast = 50 = 100 (planned 1ty) - 40 (qty allocated to the open sales order qty) - 10 (withdrawal qty)

 

BUT result from RRP3 is different and wrong:

- withdrawal qty = 40 instead of 10 (it seems that it is set = open sales order qty instead to GI qty)

- unconsumed forecast = 20 = 100 (planned 1ty) - 40 (qty allocated to the open sales order qty) - 40 (withdrawal qty)

 

 

Does anyone know if there are some new setting in ECC6 that drive this type of behaviour?

Or anyone can give me some suggestion?

 

I've tried to check the consumption situation in database tables /sapapo/dp_head and /sapapo/dh_sched but they are empty...

 

Thanks in advance

Regards

Simona