Quantcast
Viewing all articles
Browse latest Browse all 5579

SNP Planned Order more qty

Hi Folks,

 

Our scenario is from A-B-C where i am getting forecast at A & B locations and manufacturing is at C location.

 

After doing all stock negations, system should produce 100 qty at location C. We are taking a SNP optimizer run with monthly bucket with low value dummy storage cost maintained at A,B &C. The SNP run is only for one month.  We have also maintained variable single level costs in SNP PDS to enable selection of preferred mfg lines within a manufacturing location.

 

The resource is having available capacity.

 

But the optimizer is creating more than 100 qty.

 

Which cost parameter is influencing the optimizer to create more than 100 qty?

 

Regards,

Vinay


Viewing all articles
Browse latest Browse all 5579

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>