Quantcast
Viewing all articles
Browse latest Browse all 5579

PPM

1. In APO - while calculating the value of Fixed and variable capacity consumption -- for PPM
(a) (Time continuous--cap1,cap2)the formula used is that of Scheduling tab in workcenter in R/3 and
(b) (Bucket --bcap1,bcap2) the formula used is bcap1 = ( dur1 * BoM Base Quantity ) / Recipe Base Quantity

My doubt is -- what is the difference between the methods in which above capacity consumptions are calculated between SNP and PPDS PPM.
(assuming that no reource which is marked 'not relevant for SNP' in R/3 i.e. all resources are SNP as well as PPDS relevant).

2. From which ECC fields in routing/BOM -- the values of activity duration(dur1/dur2) is derived ? 

3. From which ECC fields in routing/BOM -- the values of Fixed and Variable consumption of material components are derived in PPM ?


Viewing all articles
Browse latest Browse all 5579

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>