Alternative item problem

$
0
0

Dear Sir

 

i have one problem and i search about it and not found solution for it that is :

 

I have material X FERT and contain in it's bom two material A and B , and material C will be alternative for material B

i create alternative item group Z as below

 

MaterialMaterial Bmaterial C
GROUPZZ

Priority

12

strategy

22

usage probability

0 %100%

 

My problem is  if requirement for material X is 100 and stock of material B equal 99 so system not consider this stock and jump to second priority

My question if there any method that let the  system will reserve stock from mat. B until to be zero and after that jump to second alternative material ?

 

 


regards


Nassar