Dear Sir
i have one problem and i search about it and not found solution for it that is :
I have material X FERT and contain in it's bom two material A and B , and material C will be alternative for material B
i create alternative item group Z as below
Material | Material B | material C | |
---|---|---|---|
GROUP | Z | Z | |
Priority | 1 | 2 | |
strategy | 2 | 2 | |
| 0 % | 100% |
My problem is if requirement for material X is 100 and stock of material B equal 99 so system not consider this stock and jump to second priority
My question if there any method that let the system will reserve stock from mat. B until to be zero and after that jump to second alternative material ?
regards
Nassar