Hello Experts!
I have a problem to confirm a sales order in R3 with the Time zone in APO system.
Therelevant datefor PALis WADAT(goods issue).
When we createan orderwith goods issue date inlast day month, we have a problem:
In APO, we using a plant where a shipping calendar it is set daylight savings time(less1:00:00) the dateis postponed (incorrectly). For
example:
Route: 1 Day (transit time); Shipping delivery from Monday to Friday:
Delivery Date: 06/03/2013
Goods issue: 05/31/2013
After availability check with APO the date is:
Delivery Date: 06/04/2013
Goods issue: 06/03/2013
Butif I change the shipping calendar of the same plant without daylight savings time, the dateiscorrect:
Delivery: 06/03/2013
Goods issue: 05/31/2013
After availability check with APO the date is the same (correctly).:
Delivery: 06/03/2013
Goods issue: 05/31/2013
Deliveryinmonths 06/2013with goods issuein the month05 and PAL consumptionof the month05/2013.
We use the UTC−3 an our bucket is setup with 00:00:00 with one bucket per day.