Hi,
In the detailed scheduling planning board in APO I do not see the campaign, though I selected red color for the campaign = it should be displayed in the resource chart in the DSPB (tranx /sapapo/CDPS0).
What have to be done to make the campaigns visible in the DSPB?
thank you for any useful hint!
br,
Pilvi