Hi Experts,
I am a bit confused about a very basic setting of Deployment(Deployment Heuristics).
What is governed by the ‘deployment horizon’? The pull deployment horizon controls the number of days for which Distribution Demand will be considered for Deployment(starting from today). where as the Push Deployment Horizon is the Period of time over which deployment considers receipts that were defined in the ATD Receipt category group of location master data.
However, there is another field called Deployment Horizon(available both in Background as well as interactive run). What exactly does it control?
Thanks
Kunal