Hello
What is the best way to statistically model production run rates?
Would I have to copy production into DP, run statistical forecasting, then copy the result into the resource? Or is there a better or more simple method.
Thanks!
Michael
Hello
What is the best way to statistically model production run rates?
Would I have to copy production into DP, run statistical forecasting, then copy the result into the resource? Or is there a better or more simple method.
Thanks!
Michael