We have set up PO scenario, We are not able to transfer the PO's to SNC as PO Idoc is not generating.
What can be checked inorder to trigger the Idoc from ECC.
Regards,
We have set up PO scenario, We are not able to transfer the PO's to SNC as PO Idoc is not generating.
What can be checked inorder to trigger the Idoc from ECC.
Regards,