Hi All,
Need some help.
(a) I have SNP and PPDS PDS both with Max Lot size as 200.
(b) Max Lot-size in product Master is 200 and Lot-size strategy is lot-for-lot.
(c) I have a Sales Order of quantity 250. Planned orders are created perfectly in Product View(PPDS) using Product Heuristic. But when I run SNP Heuristic (Location/network) then there are no Planned Orders.
I reduce the Sales Order Size to 150 and then SNP Heuristic plans it fine.
Can we explain this behaviour.....
Does this mean that ?
1) PPDS Heuristic looks first at the Product Master first, so it breaks quantity of 250 in 200 and 50. After that it creates orders catering to these two requirements (for these two requirements -- the PDS is valid).
2) SNP Heuristic looks at the PV Validity first. When it plans for Sales Order of 250 -- then it has no valid PDS (due to SNP PDS Max lot-size being 200) -- so it does not plan.